Does a PgMP Cohort Fit Your Time Zone and Support Needs?
Answer six questions about your local schedule, application status and preferred mentor contact. Your score runs from 0 to 12: 0-4 is the independent-study band, 5-8 is the cohort-support band, and 9-12 is the tailored-support band.
Question 1 of 6
When live online sessions are scheduled, how do they usually land in your local time zone?
Pick an answer to continue. Your result appears after question 6.
By Sanjeev Kumar, Founder · Updated 15 Sept 2026
In brief
A PgMP route should reflect your local schedule, application stage and preferred mentor contact, not just a course label. This six-question assessment uses three score bands to make those criteria visible, as of September 2026.
A score is a routing signal, not an eligibility decision
PMI has three PgMP eligibility sets, each combining education with defined project and program management experience. The assessment uses application status to identify the kind of support you may want, but it cannot determine whether you qualify. PMI’s 2026 PgMP certification page explains the eligibility sets and required application documentation.
Read the points before you start
Each answer is worth 0, 1 or 2 points. Higher points consistently mean more pressure for schedule flexibility and direct mentor contact. Your total falls into one of three bands: 0-4 independent-study band, 5-8 cohort-support band, or 9-12 tailored-support band.
Your application stage matters because PMI requires candidates to document project and program experience, then complete panel review before scheduling the exam. Read what PgMP panel review means if you need the process behind that question.
The support formats the score compares
Augment publishes a self-paced PgMP mentorship route with video modules, application-writing guidance, more than 1,000 exam-prep questions, live Q&A and six-month access. Its live Fast Track route is presented as a 12-week programme with a 5+ hour weekly commitment, live sessions, recordings and a one-to-one gap assessment. Personal mentoring is presented as one-to-one coaching tailored to individual schedules and learning needs.
A fixed cohort is not well suited to a calendar that changes frequently or to someone who wants regular individual contact. Independent study is not well suited to someone who needs live discussion to maintain momentum. The result gives a route to investigate, not a promise of eligibility, panel approval or an exam result.
What this assessment asks
6 questions. Each answer carries points; your total picks the result band below.
01When live online sessions are scheduled, how do they usually land in your local time zone?
- They are often outside practical hours
- They are usually at comfortable times
- I can attend some, with planning
02How reliable is a 5+ hour weekly study commitment over a 12-week period?
- I can usually protect it
- My availability changes frequently
- I can protect it consistently
03How available are you for recurring weekend learning sessions?
- Weekends are often unavailable
- I can attend some weekends
- Weekends are usually available
04Which application stage best describes you?
- Not yet gathering details or drafting experience summaries
- Panel review passed, focused on the exam
- Application accepted or panel review pending
05What kind of mentor contact would be most useful?
- Live group Q&A would help
- Independent materials and recordings are enough
- I want regular one-to-one guidance
06If work or travel disrupts a study week, what happens most often?
- I need a route built around changing commitments
- I can catch up without changing my plan
- I need occasional flexibility
How to read your score
| Score | Result | What it means |
|---|---|---|
| 0–4 | 0-4: Independent-study band | Your answers indicate low pressure for fixed-time instruction or individual contact. A self-paced route is the route to examine first. Augment’s self-paced PgMP programme lists video modules, application-writing guidance, more than 1,000 questions, live Q&A and six-month access. |
| 5–8 | 5-8: Cohort-support band | Your answers indicate that recurring live structure could help, provided the session times work in your local schedule. Compare the published commitment with your calendar before enrolling. Augment presents its Fast Track route as a 12-week programme with 5+ hours weekly, recordings and a one-to-one gap assessment. |
| 9–12 | 9-12: Tailored-support band | Your answers indicate that fixed cohort timing or group-only contact could leave important gaps. Investigate a schedule-tailored, one-to-one mentoring route and clarify application support before committing. Your application experience summaries remain your own responsibility under PMI’s process. |



